Nord Stream I — servicing and maintenance from 2012

Following the successful commissioning of the Nord Stream pipeline (Nord Stream I) in November 2011 — a project in which ELCON LED was entrusted with laying special cables, designing and installing electrical systems and connecting electrical measuring points and devices — the installation went into operation.

Historical reference project from ELCON’s international corporate history. The information relates to the stated period of execution and does not indicate any current activity or ongoing business relationship.

From 2012, ELCON LED was responsible for servicing and maintaining the installations.

Information taken from elcon-led.com.