Electrical engineering:A strong pressure wave was triggered by the sashing of a Cruise Missiles rare in a neighboring building, which severely damaged the OSCE's main government in Pristina. Fallen ceilings and destroyed interior walls required a complete renovation, which had to be done both quickly and cost-effectively. ELCON will take over the complete new installation of the electronic equipment as required, quickly and cheaply. The ELCON team had to face major challenges mainly because of the destroyed infrastructure and the effects of the war.
Project: | Government building – South wing in Pristina |
Description: | Complete electrical planning and execution |
Construction start: | 2000 |
Construction time: | 6 months |
Client: | OSCE – Organization for Security and Co-operation in Europe |
General contractor: | Co. Bautech GmbH |
ELCON contract: | Complete reinstallation of the electrical engineering of the building destroyed by the pressure wave of Cruise Missiles.
|
Special features: | Since the nearby building was hit by American Cruise Missiles, all windows in this building were destroyed. The entire suspended ceilings have fallen, partly also the interior walls. In this debris desert, ELCON has carried out a cost-effective complete renovation. |