| |
Project: | SOS Children’s village in Oryol |
Description: | On an area of 10 hectares, a village with 18 buildings, access Roads, streets, sidewalks and squares were built. |
Project volume: | 9 million DM |
Construction start: | June 1996 |
Construction time: | 24 months |
Client: | SOS Children’s village International e.V. – Innsbruck/Austria |
General contractor: | Trade and Industry Cooperation GmbH – Cologne |
ELCON contract: | Planning of the entire technical equipment for buildings and all technical infrastructure systems as: Transformer station, low-voltage supply system, street lighting, indoor lighting, fire alarm systems, water supply and drainage systems, pump station. |
Period of installation: | 2 months |
Special features: | The necessary infrastructure systems were part of the range of work and required thorough clarifications with the local authorities and public suppliers. |