Project: | Aeroflot-Bank in Moscow |
Description: | In an existing building, a capital renovation was carried out on 1,200 square meters to accommodate a bank. |
Project volume: | 6,5 million DM |
Construction start: | February 1995 |
Construction time: | 6 months |
Client: | Aeroflot-Bank, Moscow |
General contractor: | Maculan International GmbH, Moscow |
ELCON contract: | Planning and complete execution of all electrical and communication systems such as: interior and emergency lighting, telephone and call systems, fire alarm systems, access control system, burglar alarm system incl. safe protection. |
Period of installation: | 6 months |
Special features: | Because there was no daylight, correspondingly high demands were placed on the lighting planning. The renovation was not allowed to permanently disrupt the operation of the other companies in the building, i.e. no shutdowns during operating hours. |
Aeroflot Bank has his Moscow office modernized for 6.5 million DM and equipped it with the latest technical systems: ELCON is also responsible for the planning and installation of electrical equipment and communication systems. Within 6 months, lighting, telephone systems, fire alarm systems, access control, burglary protection systems and safe protection mechanisms will be planned and installed in parallel with the other modernization works. And all this without daylight.